From excavation to the final coat of paint
Excavation & Foundations
Excavation, dressing, backfilling, PCC and footings, with anti-termite treatment at foundation level.
RCC Frame Structure
Columns, shear walls, beams, slabs and lintels for multi-storey buildings with basements.
Masonry & Plaster
Brick and block masonry in cement mortar, with internal, ceiling and external plaster.
Finishing Work
Flooring, dado tiles, doors, UPVC windows, sanitary, plumbing, painting and railings.
Building Services
Lifts, underground and overhead tanks, STP, pump room and rainwater percolation wells.
Boundary & External
Compound walls, gates, paving and site development.


Residential, institutional and industrial
- Apartments: basement + parking + 7-floor residential towers
- Bungalows: G+2 and G+3 private homes
- Institutional: hostels, schools, police housing and training facilities
- Industrial: factory buildings and plant civil works
What “fully finished” means with us
Every quotation comes with a written specification sheet, so you know exactly what is included before work begins. This is our typical specification for an RCC-framed building; we tailor it to each project.
We use ISI-marked materials from reputed manufacturers, or approved equivalents.
| Foundation | Anti-termite treatment with long-term warranty |
|---|---|
| Shuttering | MS plates for columns, shear walls, beams and slab bottoms for true, smooth concrete |
| Plaster | Internal 12 mm single coat · Ceiling 8 mm · External 20 mm double coat |
| Flooring | 600 × 600 double-charged vitrified tiles; anti-skid matt tiles in wet areas |
| Doors & windows | Laminated flush doors, granite frames in wet areas, UPVC double-glazed windows with mosquito mesh |
| Painting | Inside: 2 coats putty, primer and paint · Outside: primer and acrylic emulsion |
| Lobby & stairs | 18–20 mm granite, MS railing 1.2 m high |
| Terrace | China mosaic waterproof finish |
| Services | Lift, UGWT, OHT, STP, pump room, rainwater percolation wells, fire-fighting as per CGDCR |
Measured on site, billed monthly
Built-up area is measured out-to-out on site, and running bills are raised every month for the previous month’s work, so you always know what you are paying for.